OVERHEAD POWER TRANSMISSION LINE CONDUCTOR SELECTION
A computer-implemented method of evaluating an electric conductor for an overhead power transmission line, comprising: receiving requirements data defining requirements for an overhead power transmission line comprising at least a span value, a maximum sag value, and a maximum tension value; receiving conductor data that define at least two conductors to be evaluated; after receiving conductor data for the plurality of conductors to be evaluated, automatically modeling expected operating performance for at least two conductors using conductor assessment software running on a computer, wherein modeling at least comprises, for at least one of the conductors to be evaluated, calculating the conductor's maximum ampacity within the constraints defined by the requirements data; and, based on the modeling, identifying at least one conductor that meets the requirements for the power transmission line using the conductor assessment software

برای کامل خواندن متن به ادامه مطلب مراجعه کنید.
نوشته : جاوید لطیفی
تاريخ: پنجشنبه 1390/06/31